Vista de página 114
Vector Control Chassis Type Frequency Converter First Start-up
SIEMENS AG 476 869 4070 76 J AB-74
SIMOVERT MASTERDRIVES Operating Instructions 10-1
10 First Start-up
Unpack and check
the units
First start-up of a unit comprises the following work steps:
After removing the packaging, check that the unit
is intact and undamaged. Only intact units may be
started-up. Please also check that the unit is com-
plete, that the correct optional boards are fitted and
that the technology option has been released, if
ordered.
Mount the unit
and install optional
boards which have
not yet been fitted
Retrofit any optional boards which have not
yet been installed, if necessary. Then install the
units taking into account the requirements at the
point of installation and the EMC instructions.
Form the DC link
capacitors, if
necessary
If the DC link of the unit was de-energized for
more than one year, you have to newly form
the DC link capacitors.
Connect the pro-
tective conductor, the
power cables or the
DC link buses and, if
present, the external
24 V incoming supply
Starting with the protective conductor, please connect
the power cables or the DC link buses and, if
present, the external 24 V supply. When laying the
cables, please observe the EMC instructions. During
this work step, please do not yet connect control
cables, communication cables, encoder cables
and motor cables (exception: cables for connecting
up an OP1S, if parameterization is intended to be
carried out via the OP1S).
Power up the external
24 V supply or
the line voltage
After checking that the cabling has been correctly
connected and that it sits properly, power up
the external 24 V supply or the line voltage. After
the electronic power supply is started, the unit
initializes itself. This action can take several seconds.
The drive status is subsequently shown on the PMU.
If necessary, carry
out parameter reset to
factory setting
If the PMU does not show status °005 after com-
pletion of the unit initialization, or if the unit has
already been parameterized before, you shoud
carry out a parameter reset to factory setting.
See
"Transport,
Storage,
Unpacking"
See
"Installation"
and
"Installation in
Conformance
with EMC
Regulations"
See
"Forming"
See
"Connecting-up"
and "Installation
in Conformance
with EMC
Regulations"
See
"Parameterization"